Finishing

A. Facing Material
FINISH WALL MATERIAL MAY BE
COMBUSTIBLE - TOP AND SIDES
20.3 cm
74 cm
0 cm
SEALANT MATERIAL
Figure 11.1 Noncombustible Facing Diagram
WARNING
Risk of Fire
• Non-combustible clearances MUST be
maintained.
• Sheetrock, wood or other combustibles must
NOT be used as sheathing or facing in the
non-combustible zone.
• See Section 11 for proper clearances.
• See Section 1 for combustible/non-combustible
defi nitions.
24
NON-COMBUSTIBLE ZONE
0 cm
Heat & Glo • Soho-CE • 2111-900 Rev. D • 6/07
• Black metal appliance front may be covered with
0 cm
noncombustible material only.
• Do NOT overlap combustible materials onto appliance
front.
• Install combustible materials up to specifi ed clearances
on top, front and side.
• Seal joints between the fi nished wall and appliance top
and sides using only a 150º C minimum sealant.
B. Mantel Projections
No mantels are allowed when using Studio-CE fronts.
Note: All dimensions are shown in centimeters
Figure 11.2 Minimum vertical and maximum horizontal
WARNING
Fire Risk.
Finish all edges and fronts to clearances and
specifi cations listed in manual.
15.2
12.7
10.2
7.6
5.1
2.6
20.3
17.8
15.2
12.7
OPENING OF FIREPLACE
dimensions of combustibles above appliance
when using the DF-SOHOCE-BK dress guard.
30.5
27.9
25.4
22.9
20.3
38.1
17.8
35.6
33.0
30.5
27.9
40.7
25.4
22.9