Install Roof Flashing And Vertical Termination Cap - Heat & Glo Balanced Flue Gas Fireplace SOHO-CE Installer's Manual

Installation and operation
Table of Contents

Advertisement

C. Install Roof Flashing and Vertical
Termination Cap
To install roof fl ashing see Figure 8.4.
For installation of vertical termination cap see minimum fl ue
heights for various pitched roofs (see Figure 8.4).
61 cm
MIN.
LOWEST
DISCHARGE
OPENING
TERMINATION
CAP
Roof Pitch
Flat to 6/12.......................................................... 0.30*
Over 6/12 to 7/12 ................................................ 0.38*
Over 7/12 to 8/12 ................................................ 0.46*
Over 8/12 to 9/12 ................................................ 0.61*
Over 9/12 to 10/12 ................................................0.76
Over 10/12 to 11/12 ..............................................0.99
Over 11/12 to 12/12 ..............................................1.22
Over 12/12 to 14/12 ..............................................1.55
Over 14/12 to 16/12 ..............................................1.83
Over 16/12 to 18/12 ..............................................2.13
Over 18/12 to 20/12 ..............................................2.29
Over 20/12 to 21/12 ..............................................2.44
* 91 cm minimum in snow regions
Figure 8.4 Minimum height from roof to lowest discharge
opening
WARNING
Fire Risk.
Explosion Risk.
Inspect external fl ue cap regularly.
• Ensure no debris blocks cap.
• Combustible materials blocking cap may
ignite.
• Restricted air fl ow affects burner operation.
20
HORIZONTAL
OVERHANG
61 cm
VERTICAL
WALL
X
30 cm
ROOF PITCH
IS X/ 30 cm
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
H (Min.) Meters
Heat & Glo • Soho-CE • 2111-900 Rev. D • 6/07
To attach the vertical termination cap, slide the inner col-
lar of the cap into the inner fl ue of the pipe section and
place the outer collar of the cap over the outer fl ue of the
pipe section.
Secure the cap by driving the three self-tapping screws
(supplied) through the pilot holes in the outer collar of the
cap into the outer fl ue of the pipe (see Figure 8.5).
(1 of 3)
CAULK
Figure 8.5
TERMINATION CAP
STORM COLLAR
SCREWS

Advertisement

Table of Contents
loading

This manual is also suitable for:

Soho-ce

Table of Contents