HP ProLiant DL145 Maintenance And Service Manual page 59

Generation 3 server
Hide thumbs Also See for ProLiant DL145:
Table of Contents

Advertisement

Figure 70 Installing a PSU
7.
Connect the new power supply cables to the system board (P22 and P34).
8.
Install the new power cable guide above the system fans:
a. Insert the power cable guide into the slots in the rail above the system fans.
b. Slide the power cable guide toward the power supply.
Removal and replacement procedures 59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl145 g3

Table of Contents