Back-Fill on a Slope
with Percent of Grade Known
You've built 55 linear feet of a three-
foot high retaining wall 3 feet out
from the base of a 65% grade. You
plan to back-fill to within 12 inches of
the top of the wall (for a 2' depth).
How many cubic yards of fill should
you have delivered?
3'
2'
A
3'
Keystroke
[On/C] [On/C]
1. Find Volume for "A"
55 [Feet]
[x] 3 [Feet]
[x] 2 [Feet] [=] [M+]
2. Find Run/Diagonal of "B"
65 [%] [Conv][Pitch]
2 [Feet] [Rise]
[Run]
[Diag]
65%
?
Grade
B
?
Display
0.
55 FT
3 FT
330 CU FT
PTCH 0.65
RISE 2 FT
RUN 3 FT 0-15/16 IN
DIAG 3 FT 8-1/16 IN