Initial Setup - L.B. White SENTINEL AT 150 Owner's Manual And Instructions

Agricultural building radiant tube heaters
Table of Contents

Advertisement

INITIAL SETUP

1. Plan the installation. Determine location for the
heater to optimize its heat pattern, keeping in mind
cooler regions in the house (end walls, and curtains)
and clearances to combustibles.
2. Hang the burner box. See Fig. 5. Maintain clearances
to combustibles as shown in Fig. 1.
3. From the burner box chain, measure the distances
shown in Fig. 6. Aligning to the center of the burner
box discharge, hang chains at these points, using
open eye hooks.
FIG. 6
10
BURNER BOX
A
B
C
HANGING CHAIN DISTANCES
TRUSS
HEATER
CENTERS
LENGTH
30 FOOT
4 FOOT
40 FOOT
50 FOOT
30 FOOT
5 FOOT
40 FOOT
50 FOOT
30 FOOT
10 FOOT
40 FOOT
50 FOOT
* A SUPPORT MUST BE CREATED BETWEEN THE TRUSSES
FIG. 5
OPEN EYE HOOKS
IN LINE WITH
EYE BOLTS ON
BURNER BOX
OPEN EYE BOLT
BURNER
DISCHARGE
HANGING CHAINS
D
E
A - B B - C C - D D - E E - F F - G
(FT)
(FT)
(FT)
(FT)
4
4
12
8
4
4
12
8
4
4
12
8
5
5
10
10
5
5
10
10
5
5
10
10
5
*
5
10
10
5
*
5
10
10
5
*
5
10
10
JOIST
TIGHTEN HOOKS
SECURELY
1 FT
F
G
(FT)
(FT)
12
12
8
5
10
5
5
*
10
5
*
AIR INLET

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentinel at 125Sentinel at 100

Table of Contents