Powerline PHG-1000X Owner's Manual page 22

Hide thumbs Also See for Powerline PHG-1000X:
Table of Contents

Advertisement

PHG-1000X
STEP 3
BE CAREFUL TO ASSEMBLE ALL COMPONENTS
IN THE SEQUENCE THAT THEY ARE PRESENTED.
NOTE:
finger tighten all hardware in this step. DO NOT wrench tighten
until the last step. some components may be pre-assembled.
nylon lock nuts will not fully screw onto bolts, must wrench tighten.
IMPORTANT:
stack if one was purchased. if you are installing a weight stack then
you will not be installing part (L) the weight rods. see step 3B
below on how to install both.
3A. insert both guide rods (O) thru rubber donuts (#36)
and into base frame (S) and secure using:
2 - (#6) M10X16mm hex head bolt
2 - (#8) M10X16mm washer
3B. insert onto guide rods (O) either weight plates or weight
rods (L) followed by rubber donuts (#36), then top
plate (N), and finish with shaft collar (#37) .
note: only attach top rubber donuts if your using weight
rods, make sure all weight plates are in same direction.
3C. attach rod frame (R) to guide rods (O) and top frame (D)
using:
2 - (#6) M10X16mm hex head bolt
2 - (#8) M10X16mm washer
2 - (#4) M10X70mm hex head bolt
2 - (#15) M10 washer
2 - (#13) M10 nylon lock nut
3D. attach selector shaft (#28) to top plate (N) using:
1 - (#12) 3/8"X3 1/2" cap round bolt
2 - (#20) M10X19mm washer
1 - (#43) 3/8" nylon lock nut
3E. insert one 50X50mm end cap (#23) into each end of rod
frame (R).
3F. insert one 64X26mm rubber donut (#29) onto each end
of top plate (N).
© Best Company srl
in this step you have the option of installing a weight
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents