Download Print this page

GE ZDP484NG Installation Instructions Manual page 12

30", 36", 48" professional ranges
Hide thumbs Also See for ZDP484NG:

Advertisement

Available languages

Available languages

Installation Preparation
STEP2
MOVE THE RANGE INDOORS
1 Tilt the range forward
on the skid.
Toekick
2 Lift the toekick out of the foam base.
4 Attach the hand-truck
straps around the unit.
IMPORTANT: Place the hand-truck
straps below
the oven door handles. To avoid damaging
the
side panels, place a pad between the hand-truck
and the range.
5 Tilt the range to lower the hand-truck
wheels
off the skid.
Hand-Truck
StrapsBelow
OvenDoor
Handles
, ,,J
3 Drive the blade of the hand-truck
beneath
the foam block.
6 Place the appliance
runners on the floor
at the left and right sides in front of the opening.
IMPORTANT" The runners provide a surface for
rolling the range into the final position and will
protect the floor finish. The runners must be
removed before leveling the range.
7 Move the range indoors. Position the range
in front of the installation
location, onto
the runners.
InsertBladeUnder
the FoamBlock
You may need to remove the front
of the foam blockto fit through
the doorway.
IMPORTANT" Do not remove the base foam
block while the hand-truck
is in use. Place
the hand-truck
blade underneath
the base
foam block and transport
the range to the final
location.
Range
Opening
Runners
for Rolling
the Range
Position
12

Advertisement

loading