Regulating Minimal Pressure; End Of Operation; Rendering The Boiler To Another Type Of Gas - BaltGaz NEVALUX-8224 User Manual

Wall-hung combi gas boiler with forced heat carrier circulation
Table of Contents

Advertisement

11.3. Regulating minimal pressure

Disconnect the wire from the terminal Д, the boiler will pass to minimal power and the error «07»
1)
will be shown on display (see p. 14.1, page 34);
Check gas pressure in the control point А. It must correspond:
2)
0,15 kPa (15 mm w.g.) for natural gas and 0,3 kPa (30 mm w g.) for liquefied
gas;
Otherwise it is necessary to set required pressure by turning the regulation screw В, keeping at the
same time the external screw Г from turning;
Connect the wire to the terminal Д.
3)

11.5. End of operation

1)
Switch the boiler off;
Disconnect the pressure gauge and screw up the cover plug in the control оpoint А up to the stop;
2)
Install a plastic cap on regulation screws C and Б;
3)
Switch the boiler on and render it to the heating mode (see p. 3.2.4, page 10);
4)
Check for gas leakages in the control points А and Б (see p. 11.2, page 25);
5)
Render the boiler to standby mode, consequently pressing the button K5;
6)
Install the front panel and fix it with 6 self-threading screws;
7)
Close the front panel's lid.
8)

12. RENDERING THE BOILER TO ANOTHER TYPE OF GAS

The type of gas to which the boiler is set up is indicated on the table on the boiler's casing and in this
Manual (see section 20, page 48).
In order to render the boiler to another type of gas it is necessary to:
Switch the boiler off (see p. 10.4, page 24);
1)
Remove the boiler's casing. For this it is necessary to screw off 4 screws (self-threading) of the
2)
casing's fixation to the boiler's bottom panel and 6 screws (self-threading) of the casing's fixation to
the front panel;
Throw open the front panel together with the lid downwards, after this remove the casing, pulling it
3)
upwards and towards yourself;
Remove the pressure cap, screwing off 4 screws (self-threading) and pulling the cap towards
4)
yourself with an effort. At reassembly you should pay CAUTION to correct installation of the cap's
side walls, which must enter the sockets on the boiler's rear wall;
Remove the manifold. For this it is necessary to screw off two screws (self-threading) of the
5)
manifold's fixation to the burner's front bracket and screw off the nut fixing the manifold to the gas
pipe with a 30-wrench (the detailed description of the manifold's removal is represented in p. 17.1,
page 41);
Replace the nozzles in the burner's manifold for the nozzle with orifice diameter:
6)
For liquefied gas - 0,79 mm;
For natural gas - 1,31 mm;
Remove the coating covering the electronic board, screwing off 6 screws (self-threading) on the
7)
coating and install the plug wire на СМ1 (see Annex III, page 66) into the position:
"А-В" for natural gas;
"В-С" for liquefied gas;
8)
Switch the boiler on and program the ignition power "Р0" (see p. 13.3.1, page 30);
Effectuate the boiler's power regulation (see section 11, page 25);
9)
Effectuate the boiler's elements' assembly in the inverted sequence;
10)
Insert changes into the boiler's label and in the Certificate of Rendering to another type of
11)
gas.
CAUTION! For rendering the boiler to another type of gas it is necessary to use only the branded
set of details.
In order to purchase the necessary details please contact the trading organization, effectuating realization
of the accessories for the boilers «BaltGaz NEVALUX» in your region.
Technical staff manual
26

Advertisement

Table of Contents
loading

Table of Contents