Boiler's Power Regulation; Preparing For Operation; Checking Gas Pressure By The Regulator's Inlet; Regulating Rated Pressure - BaltGaz NEVALUX-8224 User Manual

Wall-hung combi gas boiler with forced heat carrier circulation
Table of Contents

Advertisement

CAUTION! In case of long-term idleness of the boiler in winter time in case of using
water as a heat carrier or in case of pipeline freezing danger appearance it is necessary
to drain the heat carrier from the boiler and the heating system.

11. BOILER'S POWER REGULATION

The boiler's power regulation boils down to setting up the gas supply regulator.
CAUTION! Setting up the gas supply regulator must be effectuated only with a non-magnetic
screw-driver.
CAUTION! Setting up the gas supply regulator or rendering the boiler from one type of gas to
another must be effectuated only by specialized service organizations.

11. Preparing for operation

Switch the boiler off (see p. 10.4 , page 24) and throw
1)
open the lid of the front panel;
Screw out 6 self-threading screws of the front panel
2)
fixation;
Throw open the front panel together with the lid;
3)
Remove the plastic cap from the regulation screws В and
4)
Г (see Scheme. 13).
11.2. Checking gas pressure by the regulator's
inlet
Screw off the cover plug from the control point Б and
1)
connect the pressure gauge;
Turn the boiler on and render it to the heating mode (see
2)
p. 3.2.4, page 10);
Detect the rated power, switching on the gas analysis
3)
function (see p. 13.3.2, page 31);
Keep the boiler in the heating mode for 1 minute;
4)
Check gas pressure in the control point Б. It must correspond:
5)
1,3 kPa - 2,0 kPa (130 - 200 mm w.g.) for natural gas;
2,9 kPa (300 mm w.g.) for liquefied gas.
Otherwise it is necessary to switch the boiler off and address to gas facilities emergency service, or to
replace the gas cylinder (for liquefied gas);
To render the boiler to standby mode, consequently pressing the button K5 (see p. 3.2.4, page 10);
6)
To disconnect the pressure gauge and screw up the cover plug in the control point Б up to the stop.
7)

11.3. Regulating rated pressure

Screw off the cover plug in the control point А and connect the pressure gauge to it;
1)
Switch the boiler on and render it to the heating mode (see p. 3.2.4, стр. 10);
2)
3)
Detect the rated power, switching on the gas analysis function (see p. 13.3.2, page 31);
Keep the boiler in the heating mode for 1 minute;
4)
Check gas pressure in the control point А. It must correspond:
5)
1,0 kPa (105 mm w.g.) for natural gas and 2,5 kPa (250 mm w.g.) for liquefied gas;
Otherwise it is necessary to set required pressure by turning the regulation screw Г, keeping at the
same time the inner screw В from turning.
Scheme 13. Gas supply regulator
Technical staff manual

Advertisement

Table of Contents
loading

Table of Contents