Unpacking; Ups Clearance - Toshiba G8000 SERIES Installation And Operation Manual

480/208 v 100/150 kw
Hide thumbs Also See for G8000 SERIES:
Table of Contents

Advertisement

10.1

Unpacking

Unpack the UPS indoors on a paved floor. The UPS should be as close as possible to its final storage
location. overhead traveling cranes should be used to unpack any G8000 Series UpS. If an overhead
traveling crane is not available, allow enough space for forklift operations to unpack the UpS crate. Then
remove the crate.
points to observe
retain all small articles during unpacking and installation.
make sure that exterior paint is not scratched and that the UpS cabinet is not damaged.
Do noT damage the UpS when using tools to remove packaging materials.
If provided, Do noT remove the plastic sheet cover, until installation.
Do not remove the fan covers until UpS start up. The fan covers should be removed by
factory authorized personnel.
packing materials should be disposed by the appropriate means.
Immediately report any abnormalities to Toshiba Customer Support Center or an authorized
representative.
10.2

UPS Clearance

maintain the indicated clearance during installation. See Figure 10.1. ensure that the front and top air
vents are noT blocked.
G8000 Series with Isolated output Installation and operation manual
Side 0 in. (0 mm)
FIGURE 10.1 - UPS CLEARANCE
Top 16 in. (400 mm)
Front
44 in.
(1100 mm)
back 0 in. (0 mm)
27

Advertisement

Table of Contents
loading

Table of Contents