UPS SETUP
10
Eaton 9155 UPS (8–15 kVA) User's Guide
NOTE Be sure to support the front and back of the cabinet when rolling it off the pallet to prevent tipping.
7.
Slowly roll the cabinet toward the rear of the pallet. Once the pallet tilts, continue
rolling the cabinet down the pallet until the cabinet touches the floor (see
Figure 4).
If needed, adjust the leveling feet so that the cabinet will roll.
8.
With the cabinet supported, slowly pull the pallet away from the cabinet (see
Figure 5).
9.
Roll the cabinet to the desired location.
S
164201553 Rev G (www.eaton.com/powerquality)
Figure 4. Unloading the Cabinet
Figure 5. Removing the Pallet