Push the tab into place to secure the power cord.
6.
Connect the power cord to the AC power source.
7.
WARNING:
Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
Unplug the power cord from the power supply to disconnect power to the equipment.
Do not route the power cord where it can be walked on or pinched by items placed against it.
Pay particular attention to the plug, electrical outlet, and the point where the cord extends from
the server.

Installing the server into the rack

To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship with
the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions.com
website (http://www.racksolutions.com/hp). Follow the server-specific instructions on the website to install
the rack brackets.
CAUTION:
Install the heaviest item first, and continue to populate the rack from the bottom to the top.
To reduce the risk of electric shock or damage to the equipment:
Always plan the rack installation so that the heaviest item is on the bottom of the rack.