Installation Of Control Board - Chamberlain LiftMaster Professional SLY2500 Installation Manual

Sliding gate operator
Table of Contents

Advertisement

Installation of control board:

The assembly instructions assume that there
is no control board pre-installed.
General steps:
1. Remove cover of operator
2. Remove control board box cover
3.
Compare general pre-assembly of
control board
Picture 1: 230Volt 1-Phase motor
assembly
Picture 2: 400Volt 3-Phase motor
with motor protection switch
installed
4. Install the control board holders
4 pieces into the marked holes
See picture 3
Pic. 3
Pic. 1
Pic. 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sly2500e2

Table of Contents