Earth Ground Rod; Wire The Operator Arm To The Control Board - Chamberlain LA 400PKGU Installation Manual

Residential dc vehicular swing gate operator
Table of Contents

Advertisement

To reduce the risk of SEVERE INJURY or DEATH:
• ANY maintenance to the operator or in the area near the operator
MUST NOT be performed until disconnecting the electrical power
(AC or solar and battery) and locking-out the power via the operator
power switch. Upon completion of maintenance the area MUST be
cleared and secured, at that time the unit may be returned to service.
• Disconnect power at the fuse box BEFORE proceeding. Operator
MUST be properly grounded and connected in accordance with
national and local electrical codes. NOTE: The operator should be on
a separate fused line of adequate capacity.
STEP 6

EARTH GROUND ROD

Use the proper earth ground rod for your local area. The ground wire
must be a single, whole piece of wire. Never splice two wires for the
ground wire. If you should cut the ground wire too short, break it, or
destroy its integrity, replace it with a single wire length.
1. Install the earth ground rod within 3 feet of the control box.
2. Run wire from the earth ground rod to the control box. The earth
ground wire will be connected in a later step.
NOTE: If the operator is not grounded properly the range of the remote
controls will be reduced.
STEP 7
WIRE THE OPERATOR ARM TO THE
CONTROL BOARD
1. Choose a knockout in the bottom of the control box.
2. Insert the operator cable through the provided watertight connector.
3. Insert the operator cable and watertight connector into the knockout.
4. Slide the connector nut onto the operator cable.
5. Connect the operator cable wires to the connector according to the
colored label on the connector (white to white, red to red, etc.).
6. Plug the connector into the GATE 1 terminal on the control board as
shown.
7. Tighten the connector nut.
If installing one operator, proceed to page 20. If installing two
operators, go to the following page.
INSTALLATION
• ALL electrical connections MUST be made by a qualified individual.
• DO NOT install ANY wiring or attempt to run the operator without
consulting the wiring diagram.
• ALL power wiring should be on a dedicated circuit and well
protected. The location of the power disconnect should be visible
and clearly labeled.
• ALL power and control wiring MUST be run in separate conduit.
Control
Box
12 Gauge Wire
Check national
and local codes
for proper depth
Connector
16
Earth Ground Rod (Within
3' (0.9 m) of control box)
(control board)
Operator Cable
Watertight
Connector
Connector
Nut

Advertisement

Table of Contents
loading

This manual is also suitable for:

La 400La400dcLa400dcs

Table of Contents