Installing The Switch; Package Contents; Precautions; Safety Requirements - SMC Networks EZ Switch SMCFS1601P User Manual

Ez switch 10/100 16-port unmanaged fast ethernet poe switch
Table of Contents

Advertisement

3
I
Before installing the switch, verify that you have all the items listed under
"Package Contents." If any of the items are missing or damaged, contact your
local SMC distributor. Also be sure you have all the necessary tools and cabling
before installing the switch.
P
C
ACKAGE
The following contents should be found in your package:
One SMCFS1601P Switch
One power cord
This User Guide
Rackmount Kit
Four rubber foot pads
SMC Warranty Card
P
RECAUTIONS
To ensure a long-term and stable performance of the switch, pay attention to the
following before installation.
S
R
AFETY
EQUIREMENTS
Before cleaning the switch, disconnect the power supply. Do not clean the
switch using a wet cloth, and never use any other liquid for cleaning.
NSTALLING THE
ONTENTS
S
WITCH
– 23 –

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EZ Switch SMCFS1601P and is the answer not in the manual?

Table of Contents