Atv Break-In Procedure; Pre-Operation Inspection; Starting Procedure - E-TON Viper 40E (RXL-40E) Owner's Manual

Table of Contents

Advertisement

inline fuse on the positive lead of the battery to
protect the wiring system from over loads. If your
starter motor will not turn over and the battery is
fully charged, check the inline fuse on the unit.
Replace the fuse with a 7A fuse.
ATV Break-In procedures
Your ATV requires a break-In period just as
with all other internal combustion engines.
This period allows the engine parts to seat
and wear properly without undue strain which
can cause premature failure.
1. For the first two weeks of operation do
not run your ATV at full throttle for
extended periods of time.
2. You should only fill the fuel tank with a
premix of fuel and synthetic 2cycle oil
at a 50:1 ratio (Approximately 2.5oz of
oil per each gallon of fuel). Use
unleaded fuel only with an octane
rating of at least 89.
3. Do not operate the unit at more than
85% of maximum speed.
4. Do not over rev the engine.
5. Use light braking pressure to allow the
brake shoes to seat to the drum.

Pre-Operation Inspection

procedure
The following procedure must be
performed before each operating session.
Checking your ATV takes only a few minutes
and may save you from serious injuries and
costly repairs.
1. Check engine fuel level.
2. Check brake & brake cable operations.
3. Check tire condition and pressure.
4. Check drive chain condition and slack.
5. Check throttle operation and free play
adjustment.
6. Check engine stop switch for proper
operation.
7. Check steering system. Look for free and
smooth operation. Check all fastening
hardware.
8. Check all nuts, bolts and other fasteners
for loose conditions.
9. Inspect unit for any broken or damaged
parts.
10. Check all indictor lights and switches for
proper operation.
11. Test remote Start/Stop switch for proper
operation.
12. Test safety tether switch for proper
operation.
13. Insure you are wearing proper clothing
and protective gear. Helmet, Gloves
Pads etc.

Starting Procedure

The following procedure must be followed
each time you start your unit.
Park the unit on a level surface and lock the
parking brake.
1. Turn the fuel valve to the "ON" position.
2. Insert the key into the ignition switch and
turn to the "ON" position.
3. Turn the engine stop switch to the "ON"
position.
4. Set the carburetor choke to closed, "ON",
position by pushing the choke lever up
fully.
5. Apply slight pressure to the throttle lever.
6. Press the starter button on the left-handle
bar.
Page 14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Viper 40eRxl-40eViper 40e rxl-40e

Table of Contents