Unpacking and Installing the hp Carrier Grade Blade Server bh3710
Installing the bh3710 Blade Server in a Rack
Step 1. Unpack the blade server from its shipping container.
Step 2. Compare the contents with the packing list to ensure that all required components have been
received, as listed in Table 2-1.
Step 3. Use two or more people, or a mechanical device, to move the blade server to the installation site.
Step 4. Prepare the rack for mounting the blade server chassis.
Table 2-1
Qty
Part No.
1
A6715-62001
2
A6790-62004
2
A6780-60001
1-4
5065-7804
1-2
A6711-62001
2 to 4
A6709-60001
1
A6708-62001
1
A6712-60001
0 to 2
A6707-00014
1
A6715-70001
2
A6715-63001
Quantity depends on ordered configuration.
NOTE
Installing the bh3710 Blade Server in a Rack
The racking kit enables the installation of the bh3710 chassis into a rack. Rack kit installation
documentation is shipped with each server inside the rack kit box. Racking information may also be found at
the Web site: http://www.hp.com/racksolutions.
2-2
Blade Server Components
Exchange
Part No.
A6715-69003
A6790-69004
A6780-69001
A6783-69001
A6711-69001
A6709-69001
A6708-69001
A6712-69001
N/A
N/A
N/A
Component
6 EIA unit blade server chassis with backplane and
N+1 fan tray assembly
DC power supply
Fibre channel (FC) and LAN RTM blade
18GB fibre channel disk
FC disk carriers
256 MB DIMM
bp2200 Blade (2 slot) (front load only)
Management blade
DIMM filler (for bp2200 server blade)
Kit, spare slot blockers (2 front, 2 rear)
DC external power input cable
Chapter 2