Option 1: Connect To A New Hba (All Servers); Cabling To A New Hba - HP StorageWorks User Manual

Half-height sas tape drives
Hide thumbs Also See for StorageWorks:
Table of Contents

Advertisement

Option 1: Connect to a new HBA (all servers)

The following instructions are valid ONLY IF you have purchased and installed an additional HBA.
See
Figure 5
on page 20 and always refer to
your tape drive.
IMPORTANT:
A SAS cable for connection to a dedicated HBA is supplied with the tape drive. This is a split cable,
but the second branch is not required. Do NOT remove the tie wrap and cover on the spare connector.
1.
If necessary, install a new HBA. Follow the instructions supplied with the HBA to install it and its
driver.
2.
Connect the SAS cable supplied with the tape drive to the new HBA.
1. SAS cable supplied with tape drive
2. Connect SAS cable to new HBA
3. Unused connector on SAS cable
Figure 11 Cabling to a new HBA
.
26
Installing an internal Ultrium tape drive
http://www.hp.com/go/connect
4. New SAS HBA
5. Connector for tape drive
6. Power connector to server (Ultrium 3000 only)
BEFORE installing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents