Download Print this page

Smeg CMVANILLA Instruction Manual page 13

Advertisement

• Pass the cables through the slots in the threaded pawls (a)
and screw the cable locking screws (b) to the pawls them-
selves.
• When the operation has been
completed the result must be as
shown in the figure for all 4 ca-
bles.
EN
• At this point we have all 4 cables con-
nected to the plate
Bring the cables under tension by push-
ing them upwards so that they slide in-
side the cable clamp screw and slide out
of the slot in the threaded pawl.
This is possible because the cable clamp
screw has a system that, if mounted
properly, allows the cables to slide in-
side it in one direction only, and pre-
vents it from sliding in the other direc-
tion.
Attention, the cables all have the same
length to facilitate the operation of the
final level. The front left cable must not
be slacker than the others.
1 13

Advertisement

loading

This manual is also suitable for:

CmzoomCmvertigo