NEC Express 5800 User Manual page 64

Express5800 system rack
Hide thumbs Also See for Express 5800:
Table of Contents

Advertisement

4. Install the supporting cage-nuts in the rail. See Figure 5-12.
5. Attach the side rails and concentrator to the system rack with plated finish
screws and washers that you received with the system rack.
Note: The concentrator connector panel should face the
rear of the system rack and the blank panel should face the
front of the system rack.
5-16 Installing Rack Components
Figure 5-12. Installing the Port Concentrator

Advertisement

Table of Contents
loading

This manual is also suitable for:

42u36u27u

Table of Contents