hardware din-rail installation Switch Mounting clamp Spring DIN rail 1. Angle the switch’s mounting clamp relative to the DIN rail (above left) so that the rail is positioned under the upper lip of the clamp and behind the metal springs. 2.
Front-Panel Ports & indicators Model 503495 Model 503532 Model 503570 1 Gigabit ports 2 LEDs 3 Fast Ethernet ports bottom-Panel connectors The terminal block connections (L-R): GND, V1+ and V1– (PWR 1), Relay Output (1 A / 24 V DC), V2+ and V2–...
Need help?
Do you have a question about the 503495 and is the answer not in the manual?
Questions and answers