N-Tron 7506GX2 User Manual & Installation Manual page 13

Managed industrial gigabit ethernet switch
Hide thumbs Also See for 7506GX2:
Table of Contents

Advertisement

APPLYING POWER (Side View)
Unscrew & Remove the DC Voltage Input Plug from the top header.
Install the DC Power Cables into the Plug (observing polarity on unit).
Plug the Voltage Input Plug back into the top header.
Tightening torque for the terminal block power plug is 0.5 Nm/0.368 Pound Foot.
All LEDs will flash ON Momentarily.
Verify the Power LED stays ON (GREEN).
Notes:
 Only 1 power supply must be connected to power for minimal operation. For redundant power
operation, V
1
draw current from both sources simultaneously. Use 16-28 gauge wire when connecting to the
power supply.
Recommended 24V DC Power Supplies, similar to: N-Tron's P/N NTPS-24-1.3:
 Input AC 115/230V
 Output DC 24-28V
 Output Current 1.3A @ 24V
(Revised 2011-07-21)
and V
inputs must be connected to separate DC Voltage sources. This device will
2
1.0A @ 28V
 Power 30W
 35 mm DIN-Rail Mountable
 Dimensions: 45X75X91 mm
Page 13 of 158

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents