PROCEDURE FOR FUNCTIONAL CHECK
1. Microprocessor Controller (Computer) Board
a. Upon completing installation of the replacement microprocessor controller (computer) board, reestablish power
to the dryer.
b. Start the drying cycle by pressing any of the preset cycles in letters A-F.
c. Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit. (Refer to
the illustration below.)
38
SECTION IX
OF REPLACEMENT COMPONENTS
American Dryer Corp.
113409 - 2