Fetco CBS-51H10 User Manual page 11

Cbs-5000 series coffee brewers
Hide thumbs Also See for CBS-51H10:
Table of Contents

Advertisement

Mechanical Illustration - Dispense System
DISPENSE FITTING ASSY:
DISPENSE FITTING
BREW START/STOP
DISPENSE LATCH ASSEMBLY:
DISPENSE FITTING LOCKNUT
SOLENOID ASSY, PUSH ROD, MICROSWITCH,
HANDLE RETURN
SEAL
SOLENOID LATCH PLATE ASSY
SPRING
SEAL LOCKNUT
WATER LEVEL PROBE
BREW START/STOP HANDLE
BY-PASS TUBE
DISPENSE TUBE
CONTROL PANEL
BY-PASS VALVE
SPRAY HEAD
STOP
BREW
BREW BASKET
FLOW DISC
SPRAY CUTTER
HOT WATER TANK
LOCKNUT
FRONT VIEW
SIDE (SECTION) VIEW
To remove the dispense tube:
1. Unscrew seal locknut and
release the drive screw from
DISPENSE TUBE
dispense tube shaft.
2. Turn the dispense tube
slightly back and forth, while
pushing the tube into the hot
water tank until it is free from
the sprayhead.
Pull the dispense tube out of
the tank. Remember the tube
is bent inside the tank. The
DRIVE SCREW
seal will come out with the
SPRAY HEAD
tube.
DISPENSE TUBE SHAFT
To install the dispense tube:
TEFLON SEAL
1. Clean any lime build up off
the tube and then slide the seal
off. Push the seal carefully
TEFLON SEAL
into its chamber in the
SEAL LOCKNUT
fitting.(spring towards the hot
water tank.)
2. Place the seal locknut onto
the tube and slide the tube into
the seal. Tighten the seal
locknut.
3. Work the tube back into
the sprayhead seal.
4. Join the dispense tube
shaft and the brew handle
shaft with the drive screw.
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbs-51h15Cbs-52h20Cbs-52h15

Table of Contents