CBS-51H10 CBS-51H15 & 52H15 Full Batch 2 ¾ - 3 min. Half Batch 1 ½ min. (Allow an extra 2-4 minutes for coffee to finish dripping) Coffee Filter Size: CBS-51H10 13” X 5” Weights and Capacities Brewer Weight Model (empty) Capacity &...
Page 3
Electrical Heater Config. Code Configuration C51016 1 X 1800 watt C51026 1 X 3000 watt C51036 1 X 4000 watt C51046 2 X 3000 watt C51056 2 X 4000 watt CBS-52H15 Electrical Heater Config. Code Configuration C52016 2 X 3000 watt C52026 2 X 4000 watt C52036...
Here are the key points to consider before installation: Electrical: All FETCO brewers require NEUTRAL. Ground is not an acceptable substitute. Installation without neutral may cause damage to the electronic components. The power connection to L2 on the terminal block must be at least 105 volts. Less than 105 volts will cause erratic behavior from the brewer.
Page 6
Electrical Connection 1. Verify that the actual voltage at the electrical service connection is compatible with the specifications on the brewer’s serial number label. Make sure the electrical service includes neutral. 2. The temperature and water tank fill level are pre-set at the factory. There is no need to turn off the heaters during the installation process.
2. Pre-heat the dispensers. This step is very important to the overall success of the brewing operation. FETCO avoids the damaging affects of heat on fresh brewed coffee by using highly insulated dispensers. The dispenser must be pre-heated with hot water from the brewer.
Warranty All FETCO brewers come with a limited warranty. All warranty service must be pre-authorized by calling the FETCO Service Department at (800) 338-2699. Principles of Operation...
Page 9
Dispense System: The dispense system is completely mechanical. It is one of the areas that makes FETCO's brewer truly unique. (See the illustration in this section.) When you rotate the brew lever down to brew, the end of the dispense tube is submerged in the hot water tank. It is held in the brew position by the magnetic action of the dispense latch coil.
Page 10
Mechanical Illustration - Dispense System DISPENSE LATCH ASSEMBLY: SOLENOID ASSY, PUSH ROD, MICROSWITCH, SOLENOID LATCH PLATE ASSY BREW START/STOP HANDLE CONTROL PANEL STOP BREW BREW BASKET FRONT VIEW DRIVE SCREW SPRAY HEAD DISPENSE TUBE SHAFT TEFLON SEAL DISPENSE FITTING ASSY: BREW START/STOP DISPENSE FITTING LOCKNUT HANDLE RETURN...
Adjustments Thermostat Adjustment: For equipment manufactured before April 1, 2004 The brewer’s water tank temperature is factory set at 205°F (slightly lower for high altitudes, to prevent boiling). This setting will deliver water at 195°F ± 5° to the coffee grounds. Measure the temperature by holding a thermometer in the stream of water flowing out of the hot water faucet.
Timer Adjustment: For equipment manufactured before April 1, 2004 The timers control the amount of water that is used for brewing. The dual sided brewer, model # CBS-52H, has separate timers to control each side independently. All timers are factory set to deliver the correct amount of water. There are three possible types of timers used: •...
Page 13
A second yellow LED lights when the HEAT circuit is energized. Bypass Adjustment: (Not available on CBS-51H10) The purpose of the bypass valve is to allow a portion of the brewing water to flow between the brew basket and the wire insert, directly into the server, without coming in contact with the coffee grounds.
CBS-51H10 Parts List Part # Description 09001 Brew Basket Wire insert 13x5 101010 Brew basket assy. 13 x 5 002003 Brew Cone Weldment 13 x 5 85004 Brew handle Return Spring 14002 Brew handle Latch Plate 002005 Brew handle Latch Weldment...
Page 15
Valve ball 3/8" x 3/8" FPT 31073 Tank Fitting 3/8" MPT x 3/8" hose barb (hot water tank out) 25002 Tank vent tube, Silicone Tubing 1/4 x 7/16 x 7 3/4" 58029 Switch, slide, full/half batch selector, w/harness (optional) For current parts pricing, visit www.fetco.com.
Timer/s are set too high -Adjust timers down to appropriate level Thermal server not empty -Empty the server and try again -Call FETCO Service Dept. to discuss. Spray head missing -Attach spray head assembly. Improper dose -Measure and confirm correct dose...
Page 20
Brewing Problem Spray head / brew basket drips either side or both MAJOR Brewer won’t stop brewing (not same as high brew levels) Coffee tastes too strong Temperature Problem (brewer only) See also LUXUS problems Brew water is cold / not hot enough, ready light is OFF.
Page 21
LUXUS Server Problem LUXUS leaking from the base LUXUS leaking from sight gauge Coffee not hot enough Drip from faucet Coffee won’t dispense Possible Cause Solution Overflow of coffee, or water from -Remove the plastic base (it slips on and off) wipe the cleaning running down the side and interior and plastic base dry and reassemble.