Check the LEDs on the switch as described below.
Switch port LEDs
Switch port LEDs
When the switch is powered on, it performs a diagnostic self test. Self test
takes approximately 50 seconds to complete.
During the self test:
Initially, all the status and port LEDs are on for most of the duration
of the test.
Most of the LEDs go off and then may come on again during phases
of the self test. For the duration of the self test, the Test LED stays on.
ProCurve Switch 6400cl-6XG
ProCurve Switch 6410cl-6XG