HP AlphaServer GS80 Upgrade Manual page 26

Table of Contents

Advertisement

7. Carefully pull out the upper drawer while keeping the cables from the lower
drawer out of the way to protect them from any damage by the distribution
board assembly
assembly is engaged with the lower drawer. Tighten captive fasteners.
8. Remove the CPU and memory modules near the back left corner of the
drawer. Then, remove the two screws that hold the clock compartment
cover and remove the cover. Next, remove the plastic clock compartment
shield.
9. Attach global ports marked A0 and B0 to the connectors on the backplane
labeled A0 and B0. Route the power harness loose female connector and
global cables from the upper drawer to the connectors in the distribution
board assembly
and attach without twist to the distribution board.
NOTE: Figure 2–4 does not show global cables being routed through the inner
chassis cable clamp.
10. Connect the power harness plug from the lower drawer to the power
harness receptacle of the upper drawer
drawer receptacle and clock module are not used.
11. Route the coax cable from the lower drawer through the distribution board
assembly and the upper drawer rear cutout and connect it to the clock
module of the upper drawer. Coil excess cable into no less than a 3-inch
diameter loop through the clamp in the distribution board assembly
Install shield and clock compartment cover with screws.
2-10 AlphaServer GS80 Upgrade Manual
(see Figure 2–5). Ensure that the distribution board
. Fold cables such that they route flat under the bracket
(see Figure 2–6). The bottom
.

Advertisement

Table of Contents
loading

Table of Contents