HP AlphaServer GS80 Upgrade Manual page 25

Table of Contents

Advertisement

Refer to Figures 2-4 to 2-7 and make cable connections from the drawers to the
distribution board assembly. Do the lower drawer first.
1. Loosen captive fasteners on the distribution board assembly and extend the
lower drawer.
2. Remove drawer cover to assemble and route cables.
3. Remove the CPU and memory modules near the back left corner of the
drawer. Then, remove the two screws that hold the clock compartment
cover and remove the cover. Next, remove the plastic clock compartment
shield.
4. Attach global cables marked A1 and B1 to backplane connectors marked A0
and B0, and route through clamp and chassis cutout
5. Route male end of power harness through rear cutout and secure unused
female connector with clamp
6. Route coax cable and power harness through chassis cutout
the clock compartment shield and the clock compartment cover removed
earlier. Reinstall the CPU and memory modules and reattach the drawer
cover.
.
.
. Reinstall
System Upgrade
2-9

Advertisement

Table of Contents
loading

Table of Contents