HP AlphaServer GS80 Upgrade Manual page 23

Table of Contents

Advertisement

Refer to Figure 2–3 and install the distribution board assembly as follows:
1. Pull the top drawer out of the cabinet and remove the placeholder bracket
.
Push the drawer back in.
2. Repeat step 1 on the lower drawer. Discard the placeholder brackets.
3. At the rear of the cabinet, push both drawers out about ten inches. Insert
the distribution board assembly from the rear of the cabinet and fasten it to
the upper and lower drawers
screws and the lower part with two captive screws. Note the guide pins and
mount the assembly to the upper drawer first. Do not tighten screws.
Ensure that lower captive screws are aligned and engaged to lower drawer.
If alignment of captive fasteners is not possible, loosen the eight M6 slide
mounting screws of one drawer and adjust for proper alignment. Once
alignment is made, tighten all screws and torque M6 screws to 6.9 Newton-
meters and M4 screws to 2 Newton-meters. Do not torque captive fasteners.
. The upper part is fastened with two M4
System Upgrade
2-7

Advertisement

Table of Contents
loading

Table of Contents