Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment; Figure 3-1 Rj-45 Connections - Edge-Core ES4324 Installation Manual

24-port gigabit ethernet lite switch
Table of Contents

Advertisement

3
Installing the Switch

Equipment Checklist

After unpacking the switch unit, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.

Package Contents

• ES4324 switch
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power cord—either US, Continental Europe or UK
• This Installation Guide
• Management Guide CD
• Warranty Registration Card—be sure to complete and return to Edge-core

Optional Rack-Mounting Equipment

If you plan to rack-mount the switches, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
3-2
RJ-45 Connector

Figure 3-1 RJ-45 Connections

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents