Toshiba R600 S4202 - Portege - Core 2 Duo 1.4 GHz Maintenance Manual page 285

Maintenance manual
Hide thumbs Also See for R600 S4202 - Portege - Core 2 Duo 1.4 GHz:
Table of Contents

Advertisement

4.22 Cover assembly/LCD assembly
Installing the Cover assembly/LCD assembly
To install the cover assembly/LCD assembly, follow the steps below and refer to Figure 4-30
to 4-33.
1. Set the PW SW button to the slot.
2. Set the SW board to the appli button.
3. Set the appli button to the slot.
4. Set the LCD assembly to the cover assembly and secure them with following screws.
• M2.5×4B
NOTE: Insulators are not put on the back of a new COVER ASSY. Stick new insulators
as shown in the figure below.
Insulator
(HNS HLD CA INSULATOR)
Insulator
(HNS HLD CB INSULATOR)
PORTÉGÉ R600 Maintenance Manual (960-709)
FLAT HEAD
4 Replacement Procedures
×2
Insulator
(COVER INSULATOR)
[CONFIDENTIAL]
4-57

Advertisement

Table of Contents
loading

Table of Contents