Condensate Disposal System - Friedrich VERT-I-PAK 920-075-13 (1-11) Installation And Operation Manual

A-series single package vertical air conditioning system 9,000 - 18,000 btu/h
Table of Contents

Advertisement

Available languages

Available languages

Figure 10
Adjust the Divider
Adjustment
Loosen the two screws located on the top side of the divider.
Slide the top part of the divider toward the outside until the
sealing strip makes contact with the outdoor louver. Tighten
the divider screws to complete the adjustment.
NOTE: Let the caulk cure completely before installing the
chassis. This completes the plenum installation.
Condensate Disposal Preparation
for 9000 / 12000 / 18000 Models ONLY
IMPORTANT: This step must be performed to ensure that
the chassis installs and seals properly in the wall plenum.
If provisions for condensate disposal are made prior to
chassis installation and the drain is to be located beneath
the platform for the unit, use the accompanying drawing as
a guide for cutout locations. Only one drain per unit is
required.

Condensate Disposal System

The Condensate Disposal System increases energy
efficiency utilizing a factory installed fan that sling the cold
condensate onto the hot outdoor coil.
When high outdoor humidity prevents the slinger from
disposing of all the condensate, the excess condensate
overflows into the condensate drain pan and out of the ¾"
internal drain connections.
NOTE: If the Condensate Disposal System fails to remove
all of the condensate from the unit, any excess condensate
will overflow from a spillway in the rear of the unit directly
into the wall plenum, and drain outside the building. This is
your indication that the chassis or drain requires servicing.