System setup
The following setup installation steps are described in detail in other
sections of this chapter:
Important! DO NOT attempt the procedures in the following
sections unless you are confident of your capability to perform
them. Otherwise, ask a service technician for assistance.
1
Unpack the server.
Refer to the succeeding "Unpacking the server"section.
2
Set up the server as a stand-alone unit (refer to page 20).
- or -
Mount the server into the rack (go to page 35).
3
Connect the server cables (see page 21).
4
Connect the monitor and other peripheral devices (refer to
page 21).
5
Connect the server to the power supply (go to page 22).
6
Turn on the server (refer to page 23).
7
Configure the server (see page 25).
Unpacking the server
Important! Please note the safety instructions on page vii and
the pre-setup reminders on page 17.
1
Transport the server to the place where you want to set it up. Do
not unpack the server until you are done transporting.
2
Unpack all the individual parts. The Fortress 1120 package
contents include the following:
•
Fortress 1120 system
•
CPU heatsink assembly
•
System cables and screws package
•
Rubber foot (for stand-alone model only)
19