Applying Power & Startup - AMX Precis HT Instruction Manual

Distribution matrix
Hide thumbs Also See for Precis HT:
Table of Contents

Advertisement

Installation & Setup
Applying Power & Startup
The enclosure's universal power receptacles will accept all major international standard power sources.
Standard US power cords are provided for installations within the US. Maximum power specifications
are on the power receptacle (also listed on page 11). Always use an earth-grounded power cord / system
with a Precis HT.
The source electrical outlet should be installed near the Precis HT, easily accessible, and properly
grounded. Power should come from a building branch circuit. We strongly recommend using a dedicated
line for the system's power. Use a minimum breaker current rating of 15 A for 110 V or 30 A for 230 V.
To avoid an overload, note the power consumption rating of all the equipment connected to the circuit
breaker before applying power.
Caution: To avoid system damage, turn on all power for the AMX AutoPatch equipment
at the same time before applying power to the system's source and destination devices. We
recommend attaching all power cords to a surge protector and/or an AC line conditioner.
Power-Up Sequence
To apply power:
1.
Attach the first two source and destination devices (see "Attaching Inputs & Outputs," page 22).
Do not apply power to the source and destination devices until Step 7.
2.
Optional – Attach an external controller (see "Attaching External Controllers," page 18).
3.
Plug the power cord into the power receptacle on the enclosure.
4.
Plug the other end of the power cord(s) into a power strip (we recommend using a 30 A power strip)
that is turned off.
5.
Turn on the power strip.
The Power Indicator on the front of the enclosure illuminates (FIG. 17).
FIG. 17
Power indicator on enclosure front
6.
Optional – Apply power to any external control device/system.
7.
Apply power to the source and destination devices.
The Comm indicator on the front of the enclosure (FIG. 17) blinks green to indicate Ethernet traffic
on the system.
For startup information on specific types of control before executing a test switch, see page 18.
The system is ready for a test switch (see "Executing A Test Switch" on page 28).
Note: For information on checking the software and hardware versions, see page 27.
26
Power indicator
Comm indicator
Precis HT Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents