AMX Precis HT Instruction Manual page 22

Distribution matrix
Hide thumbs Also See for Precis HT:
Table of Contents

Advertisement

Installation & Setup
Installation Procedure
A flow chart showing the installation sequence is in FIG. 5. The procedure following provides general
steps with references to detailed information found in later sections of the manual.
FIG. 5
Installation procedure
Caution: To prevent overheating and airflow restriction, avoid placing high-heat producing
equipment directly above or below the enclosure. The system requires a minimum of one empty rack
unit above and below (three empty rack units are recommended).
To install and set up a Precis HT in a rack:
1.
Attach rack ears per FIG. 6.
FIG. 6
Attach rack ears to sides of enclosure
2.
Place the enclosure in the rack and attach front-mounting screws to hold it firmly in place (FIG. 7).
FIG. 7
Place in rack and fasten with mounting screws
Tip: When placing enclosures, keep in mind that the optimal viewing angle for a control panel is eye
level.
3.
Optional – Establish communication with an external control device/system; see "Attaching
External Controllers" on page 18.
4.
Attach only the first two source devices and the first destination device; see "Attaching Inputs &
Outputs" on page 22.
Do not apply power to the devices until after the Precis HT has power (Step 5).
16
Precis HT Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents