Table Of Contents - ACV HeatMaster 201 Installation, Operating And Servicing Instructions

Table of Contents

Advertisement

INDEX
Target group
Symbols
Certification
Using the boiler
HeatMaster
®
setting instructions
INSTALLATION
Boiler room
Chimney connections
Hot water connections
Heating connection
Electrical connections
COMMISSIONING
Filling the hot water and heating circuits
ACV BG 2000-M modulating premix gas burner
MAINTENANCE
Service intervals
Servicing the boiler
Servicing the safety devices
Servicing the burner
Draining the boiler
MCBA FOR SPECIALISTS: INSTALLER,
SERVICE ENGINEER
Pilot mode
Safety stop (Error mode)
Entering the code
Information on the installation
Communication mode (with code)
Error mode
SPARE PARTS
Jackets
Accessories
Setting and electrical accessories
Burner
SERVICE RECORD
Installation details
Service notes
1
TARGET GROUP
1
This manual is intended for the use of:
1
- final users of the appliance;
1
- the engineer installing and starting up the appliance;
2
- the engineering and design department;
- the installer responsible for servicing or maintaining the appliance.
2
SYMBOLS
2
3
The following symbols are used in these instructions:
4
4
4
4
Essential instruction for operating the system
6
correctly.
6
6
7
7
7
8
8
8
Essential instruction for personal safety or
9
environmental protection.
10
10
12
12
12
12
Danger of electrocution.
14
D A N G E R
14
14
14
14
14
HOT
15
15
16
17
Risk of scalding.
20
20
21
21
CERTIFICATION
22
The appliances carry the "CE" mark, in accordance with the
standards in force in the various countries (European Directives
22
92/42/CEE "Efficiency" and 90/396/CEE "Gas Appliances"). They
22
also carry the labels, "HR+".
22
22
23
23
23
INTRODUCTION
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents