With the Oracle backup set ZDB method, you must manually re-synchronize the
recovery catalog database with the current control file after you modified the
physical schema of a database (for example, if you add or drop a tablespace,
add a new datafile, or add or drop a rollback segment) and before you start the
next backup.

Scheduling backup specifications

Scheduling a backup specification means setting the time, date, and type of a backup
that starts unattended once the scheduling options are defined and saved in the
backup specification.
For more information on scheduling, see the online Help index: "scheduled backups".
To schedule an Oracle ZDB backup specification, proceed as follows:
1.
In the Data Protector Manager, switch to the Backup context.
2.
In the Scoping Pane, expand Backup Specifications and then Oracle Server.
3.
Double-click the backup specification you want to schedule and click the Schedule
tab.
4.
In the Schedule page, select a date in the calendar and click Add to open the
Schedule Backup dialog box.
98
Data Protector Oracle ZDB integration

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Data Protector A.06.11 and is the answer not in the manual?

Questions and answers

Table of Contents