HP BladeSystem c7000 Setup And Installation Manual page 62

Enclosure
Hide thumbs Also See for BladeSystem c7000:
Table of Contents

Advertisement

minutes to power up, while an enclosure with fewer blades might take less time. Server blades are powered
up incrementally, starting from device bay 1.
When first initialized, the Onboard Administrator programs the mezzanine cards on the blades during
discovery. After the mezzanine cards are programmed, powering up the enclosure takes only 1 to 2 minutes.
The enclosure and the Insight Display now have power. Configure the enclosure
installation
steps" on page 65) using the Insight Display.
PDU installation
The PDU can be installed in either a 1U or a 0U configuration. For more information about installing the PDU
in the rack, see the installation instructions that came with the PDU.
IMPORTANT:
configuration.
IMPORTANT:
PDU. Do not exceed the rated current on circuit breakers.
To connect power to the PDU:
Connect the AC power cables to the power connectors on the rear of the enclosure corresponding to the
1.
power supply that was populated on the front of the enclosure.
Rack-based single-phase PDUs cannot be used with a three-phase power
Total VA load of the attached enclosures should not exceed the VA capacity of the
("Running the Insight Display
Cabling and powering up the enclosure 62

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents