Top Vent - Horizontal Termination
Venting with 3 elbows (NG)
V
Minimum
1
90 Elbow
1/2 ft.
152 mm
1-1/2 ft.
457 mm
2-1/2 ft.
762 mm
3-1/2 ft.
1.1 m
H
+ H
MAX. =14 ft. (4.3 m)
1
2
V
+ V
+ H
+ H
1
2
1
Figure 7.6
26
H
+ H
Maximum
1
2
0 ft.
0 mm
1 ft.
305 mm
2 ft.
610 mm
4 ft.
1.2 m
6 ft.
1.8 m
MAX. = 40 ft. (12.2 m)
2
Note: Use SLP Series
components only.
H
2
Quadra-Fire • QV32B-A, QV36B-A • 2014-900 Rev. U • 1/12
Top Vent - Horizontal Termination
Venting with 3 elbows (Propane)
V
Minimum
1
90 Elbow
1/2 ft.
1-1/2 ft.
2-1/2 ft.
3-1/2 ft.
H
1
V
+ V
+ H
1
2
Note: There MUST be a 25%
reduction in total H when
using fl ex vent except when
using the simple up and out
installation (see Figure 5.3).
V
2
H
1
H
+ H
Maximum
1
2
Not Allowed
152 mm
0 ft.
0 mm
457 mm
2 ft.
610 mm
762 mm
4 ft.
1.2 m
1.1 m
6 ft.
1.8 m
+ H
MAX. =14 ft. (4.3 m)
2
+ H
MAX. = 40 ft. (12.2 m)
1
2
V
1
Need help?
Do you have a question about the QV32B-A and is the answer not in the manual?