Download Print this page

GE Profile PV977 Owner's Manual And Installation Instructions page 21

Island chimney vent hood

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLATI ON-R ECIRCU LATING
ISTEP 11 MOUNT TEMPLATE
• Align the template
with the marks on the ceiling
and tape in place.
- Be sure the template
is oriented correctlg
with the front of the hood.
• Use a plumb bob to be sure the mounting
holes
will provide parallel alignment
with the countertop
below.
• Determine wire access hole location.
• Center punch all screw and determined
wire hole
locations.
• Drill pilot holes in the 4 screw locations. Use a :3/16"
bit and drill approximatelg
1-1/2" deep.
• Drill one 1/2" hole for wires.
..........................................
I............................................
I
FRONT
(_F HOOD
........................................
_
............................
5.%,,..LA..
NOTE: Do not cut the duct opening shown on the template
for this recirculating installation.
STEP 21 INSTALL AIR DEFLECTOR
INTO CEILING SUPPORT
• Lag ceiling support on a firm surface, clip side up.
Position the air deflector onto the ceiling support,
duct opening up and one of the open sides to what
will be the front of the hood assemblg. The tabs on
the deflector will be to the outside of the ceiling
support.
• Using 2 screws provided,
secure the tabs on the
deflector to the ceiling
support.
ISTEP 31 INSTALL CEILING SUPPORT
AND DEFLECTOR ASSEMBLY
• Using the 4 wood screws provided, attach the
ceiling support using the pilot holes drilled in step 1.
Front
--Screws
.....
ISTEP 41 INSTALL LOWER VERTICAL
AND HORIZONTAL SUPPORTS
TO HOOD ASSEMBLY
• Using screws provided, attach the 4 lower
vertical supports to the hood assemblg with
4 screws per support.
Using screws provided, install the horizontal
support in the second outer holes of the vertical
supports.
21

Advertisement

loading