Installation Preparation
CONSTRUCT CEILING SUPPORT (Continued)
• Secure each 2 x 4 block with at least four (4), #10
wood screws, 3" long (not supplied). Use 8 wood
screws total for the two supports.
• The cross framing
must be accurately
aligned
to assure correct
positioning
of the hood.
• The cross framing must be level in all directions.
Check with a spirit level and adjust if necessarg.
IMPORTANT: The ceiling structure
must be capable
of supporting
the weight of the hood (approximatelg
200 pounds) and ang inadvertent
user contact loads.
The hood support frame will be supported
bg the
2 x 4 cross framing.
Ductwork
for Installations
Vented to the Outdoors
• Use the shortest and straightest
duct route possible.
For satisfactorg
performance,
duct run should not
exceed 100 feet equivalent
length for ang duct
configuration.
Refer to "Duct Fittings" chart to compute
the maximum
permissible
length for duct runs
to the outdoors.
This vent hood must use 8" round rigid duct.
Install the house ductwork to run horizontallg
between ceiling joists or straight up through
the roof.
Finish the Ceiling
• Finish the ceiling surface. Be sure to mark location
of the ceiling joists and cross framing. Check to be
sure the ceiling is level; use shims if necessarg.
2 x 4 min.
Crossframing
Ceiling
joist
(f
Y
(
l/
>
.....
Ceiling j0ist
/
1
8"
/
\,.
q
t
..........
--...x
2x4
Vent straight up
through the ceiling
15