Validation Step 7-Virtualization Verification; Validation Process; Setup For Verifying Virtualization - Qlogic Storage Networking (Unified Fabric Pilot Installation Manual

Storage networking (unified fabric pilot)
Table of Contents

Advertisement

Validation Step 7—Virtualization Verification
This validation step compares the performance of virtual machines on a single
host with performance on multiple hosts. The test runs one iSCSI initiator in one
virtual machine, and one FCoE initiator in another virtual machine as shown in
Figure
5-30.
Figure 5-30. Setup for Verifying Virtualization

Validation Process

1.
Set up two virtual machines on one server, and install MLTT on each virtual
machine.
2.
Set up ETS.
3.
Configure the Analyzer to capture any frame.
4.
Use MLTT to set up remote control from one virtual machine, so that you can
control both virtual machines from one MLTT interface.
5.
Use MLTT to map iSCSI storage and Fibre Channel storage devices for
individual virtual machines.
51031-00 A
5–Validation Methods for DCB and FCoE
Validation Step 7—Virtualization Verification
4Gbps
10Gbps
5-29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Storage Networking (Unified Fabric Pilot and is the answer not in the manual?

This manual is also suitable for:

8100 series5800 series

Table of Contents