Qlogic 5800V Series Installation Manual page 62

Stackable fibre channel switch
Hide thumbs Also See for 5800V Series:
Table of Contents

Advertisement

2–Planning
Security
b.
2.
Configure security on Adapter_1 using the appropriate management tool.
Logins between the Switch_1 and Adapter_1 will be challenged for their
respective secrets. Therefore, the secrets for Switch_1 and Adapter_1 that
you configured on Switch_1 must also be configured on Adapter_1.
3.
Save and activate Security_Set_1 on Switch_1.
4.
Create a security set (Security_Set_2) on Switch_2. Create an ISL group
(Group_ISL_2) in Security_Set_2 with Switch_2 and Switch_1 as members,
as shown in the following table:
5.
Save and activate Security_Set_2 on Switch_2.
2-24
Create an ISL group (Group_ISL_1) in Security_Set_1 with Switch_1,
Switch_2, Adapter_1, and JBOD as members, as shown in the
following table:
Switch_1
Node WWN: 10:00:00:c0:dd:07:e3:4c
Authentication: CHAP
Primary Hash: MD5
Primary Secret: 0123456789abcdef
Binding: None
Switch_2
Node WWN: 10:00:00:c0:dd:07:e3:4e
Authentication: CHAP
Primary Hash: MD5
Primary Secret: abcdefabcdef012
Binding: None
The Switch_1 secret must be shared with the Switch_2 database.
Switch_2
Node WWN: 10:00:00:c0:dd:07:e3:4e
Authentication: CHAP
Primary Hash: MD5
Primary Secret: 0123456789abcdef
Binding: None
Switch_1
Node WWN: 10:00:00:c0:dd:07:e3:4c
Authentication: CHAP
Primary Hash: MD5
Secret: abcdefabcdef012
Binding: None
59265-02 B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents