Genie AWP Super Series 114002 Operator's Manual page 18

Table of Contents

Advertisement

Operator's Manual
FUNCTION TESTS
Function Tests
Setup
1 Position the machine on a firm surface directly
below the desired work area.
2 Connect to the appropriate power source:
DC models: Connect the battery pack.
AC models: Connect to a grounded 15A AC
power supply. Use a 12 gauge / 3.3mm
grounded extension cord no longer than
50 feet / 13 m.
Air models: Connect the air line.
3 Insert the key and turn to platform control.
4 Pull out the red Emergency Stop button to the
on position at the ground controls.
5 Twist to release the red Emergency Stop button
at the platform controls.
Result: AC & DC models: The power light should
come on.
Air models: The air pressure gauge should read
80-110 psi /5.5 - 7.8 bar.
6 Select an outrigger and
slide it into a base
socket until the
outrigger lock pin snaps
into place. Adjust the
outrigger to level the
machine and raise the
base casters slightly off
the ground. Level the
machine using only the
outriggers.
7 Check the interlock display
lights at the ground
controls. Confirm that the
corresponding light is on.
16
8 Repeat this procedure for each of the remaining
outriggers.
9 Use the bubble level and adjust the leveling
jacks until the machine base is level.
2
3-wire
Test Emergency Stop
10 Push in the red Emergency Stop button at the
ground controls to the off position.
11 Push in the control activate button and rotate
the up/down switch in the direction of intended
travel.
Result: The up/down function should not
operate.
Genie AWP Super Series
Third Edition • Fourth Printing
Part No. 114002

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Awp super seriesAwp-20sAwp-25sAwp-30sAwp-36sAwp-40s

Table of Contents