Download Print this page

LG GR-L247ER Parts List And Instructions Manual page 75

Hide thumbs Also See for GR-L247ER:

Advertisement

TROUBLE DIAGNOSIS
Items
Precautions
6. Gas-leakage test
7. Pipe arrangement
in each cycle
Evaporator
Compressor
[
t_
J
_
Condenser
Bombe
4) Refrigerant
Charging
Charge refrigerant while operating a compressor
as shown above.
5) Pinch a charging pipe with a pinch-off plier after completion
of charging.
6) Braze the end of a pinched charging pipe with copper brazer and take a gas leakage test
on the welded pads.
* Take a leakage test on the welded or suspicious
area with an eioctronic leakage tester.
Check each pipe is placed in its edginal
place before closing a cover back-M/C
after completion of work. Particularly
control the size of Joint Drain Pipe
fi
ubber
3-5. Standard Regulations For Heavy Repair
1) Observe the safety precautions for gas handling.
2) Use JIG (or wet towel) in order to prevent electric wires from bumleg during welding. (In order to prevent insulation
break and accident.)
3) The inner case shall be melted and insulation
material (polyurethane)
shall be burnt if not cared during welding inner
case pads.
4) The copper pipe shall be oxidized by overheating
if not cared during welding,
5) Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)
6) Observe that the inserted length of a capillary tube into a drier should be 12 :_mm.
Drier
SievesM°lecular
""_ll_i_
L-I _.
Molecular
/_
Pipe
7) Make sure that the inner diameter should not be distorted while cutting a capillary tube.
8) Be sure that a suction pipe and a filling tube should not be substituted each other dudng welding. ( High efficiency
pump.)
- g7 -

Advertisement

loading

This manual is also suitable for:

Gr-l207er