INSTALLATION
INSTRUCTIONS
INTERIOR-MOUNTED
VENT MOTOR
Determine which venting method is best for your application.
Vent system can terminate either through the wall or floor.
Island
Location
Front (standard)
mounted
Rear mounted
blower
motor
blower
motor
m
&
m
. _ ....................................................
i_,_.'A
A. Down vent
NOTE: For island locations, a front or rear mounted blower motor
can also be mounted for right or left venting if needed for your
application.
Most island applications
would still require the
venting to be directed down through the floor.
Built-In Cabinet Locations
/
B
A. Down vent
B. Left vent
C. Right vent
if' ...........
II
II .......
C
Island Location--Vent System Installed Under a Concrete
Slab Using PVC Sewer Pipe
Front (Standard) Mounted Blower Motor
A
K
B
,i
.................................................
E
S
J
'_/
Rear Mounted Blower Motor
A
M
B
S_
K
J
_
.......................
F E
I
A. Wall cap
B. 6" (15.2 cm) round metal vent
C. 16" (40.6 cm) maximum
D. 6" (15.2 cm) round PVC sewer pipe
E. 6" (15.2 cm) round metal vent transition with
damper (supplied)
F. 6" (15.2 cm) round PVC coupling
G. Concrete slab
H. 6" (15.2 cm) round PVC sewer pipe
I. 6" (15.2 cm) round 90 ° PVC sewer pipe elbow
J. Tightly pack gravel or sand completely
around pipe.
K. 6" (15.2 cm) round 90 ° PVC sewer pipe elbow
L. 6" (15.2 cm) round PVC coupling
M. 12" (30.5 cm) minimum
8