Download Print this page

Installation Instructions - Friedrich ZStar ZQ08 Installation And Operation Manual

115 volts

Advertisement

Installation Instructions
Read these instructions completely and carefully.
Before YouBegin
NOTE TO INSTALLER: Leave these
instructions w ith the air conditioner after
installation iscompleted.
NOTE TO CONSUMER: Keep this Installation
and Operation Manual for future use.
Important
notes:
It is recommended that proper attire be worn
during installation.
For personal safety, this air conditioner must
be properly grounded.
It is importantto have the wall outlet and circuit
checked by a qualified electrician if there is any
doubt as to whether a proper ground exists.
CAUTION:
Do not under any circumstances,cut or remove
the third (ground) prong from the power cord.
Do not change the plug on the power cord of
this air conditioner.
Aluminum house wiringmay present special
problems-consult a qualified electrician.
Electrical Data
Line Cord Plug
Use Wall Receptacle
Power Supply
Power supply cord with
3-prong grounding plug
Standard 125V, 3-wire grounding
receptacle rated 15A, 125V AC
Use 15 AMP time
delay fuse or circuit
breaker.
Tools You Will Need
[3 Phillips-head screwdriver
[3 Flat-blade screwdriver
[3 Ruler or tape measure
[3 Scissors or knife
[3 Pencil
[3 Level
[3 Hammer

Advertisement

loading

This manual is also suitable for:

Zstar zq10