Download Print this page

Friedrich ZStar ZQ08 Installation And Operation Manual page 14

115 volts

Advertisement

Installation Instructions
Install the Case in the Window
Step 1.
Step 2.
Open the window and mark the
centerline of the window stool (or desired
air conditioner location).
Carefully place the case on the window
stool and align the center mark on the
bottom front with the centerline of the
stool
Step 3. Pull the window down behind the top
mounting rail
Window Sash
Top
:_ash
mountaing rail
Top
mounfmg _111 I
_
Frame curtains
rail
L III
I/_//
Win_ bwstool
Front angle
NOTE: Do not shut the window so tightly that
movement of the frame curtains is restricted.
Step 6. Adjust the bolt and the nut in each
support so thatthe case is installedwith
a slight downward tilt (about 1/2").
Step 7. Secure the case to the window stool by
using 3 type B screws.
Track
Step 4. Loosely assemble the sill supports.
_.
, OUTDOOR
IN,OR
._
.
ill Support
_- Nut
Bolt J
Step 5. Select the position that will place the sill
supports near the outermost point on the
sill. Attach the sill supports to the case
track hole in relation to the selected
position using 2 type A screws in each
support.
Front Angle
Screw(Type B)
Sill Support
Step 8. Pull the frame curtains to each window
sash track. Attach them on each side to
the window sash and the window stool
using 4 type C screws.
Installthe WindowLockingBracketand the FoamTopWindowGasket
Step 1.
Step 2.
Step 3.
Attach the window locking bracket with
type C screw.
Cut the foam top window gasket to the
window width.
Stuff the foam between the glass and the
window to prevent air and insectsfrom
getting intothe room.
ow gasket

Advertisement

loading

This manual is also suitable for:

Zstar zq10