Craftsman 113.19761 Owner's Manual page 11

10-inch radial saw
Table of Contents

Advertisement

ALIGNMENT
PROCEDURE
IMPORTANT:
IN ORDER
TO OBTAIN
MAXIMUM
CUTTING
ACCURACY,
THE
FOLLOWING
SIX STEPS
MUST
BE
CAREFULLY
FOLLOWED.
BECOME
THOROUGHLY
FAMILIAR
WITH
THESE
STEPS
SO THAT
YOU CAN ALWAYS
MAINTAIN
YOUR
SAW
IN
PROPER
ALIGNMENT.
THE
ACCURACY
OF
EACH
ADJUSTMENT
IS
ALWAYS
DEPENDENT
UPON
THE A CCURA
C Y OF THE PRECEDING
ADJUSTMENT.
After
following
the
6
step
assembly
and
alignment
procedure
and
the
Basic
Saw
operation
section
refer
to
Trouble
Shooting
section
if any
difficulty
is experienced
when
performing
any sawing
operation.
STEP ON E
NOTE:
The following
adjustment,
performed
properly,
will
result
in the work
table
being parallel
to the arm.
ATTACHING
AND
LEVELING
TABLE
MOUNTING
SUPPORT
CHANNE
LS.
1.
Attach
table
mounting
support
channels
with
four
square
head 5/16-18
x 3/4 screws, Iockwashers
and flat
washers and nuts. POSITION
SCREWS
IN CENTER
OF
CHANNEL
SLOTS,
finger
tight
to permit
channels
to
"slip"
against
the base when
leveling.
TABLE
MOUNTING
SUPPORT
CHANNEL
\
SCREWS
HERE
LOCKWASHER
/
FLAT
WASHER
2.
3.
4.
Release
bevel lock
lever,
move
bevel
index
pin to left
and rotate
the motor
to position
saw blade,
end of shaft
down.
Lock
bevel lock.
Unlock
and
hold
arm
control
lever
in
index
release
position
as
shown.
Position
arm
against
left
st'op
(approximately
50 ° miter).
Loosen
carriage
lock
knob
and position
carriage
directly
over left hand channel.
NOTE:
For
safety
reasons
in accordance
with
the UL
standard,
stops
have been
provided
to
prevent
360 °
r_tation
of the radial
arm.
S;ide
the arbor
wrench
handle
between
end of motor
shaft
and
mounting
channel
to act as a feeler
gauge.
Carefully
lower
the
motor
with
elevation
crank
until
the end of shaft
is just touching
the arbor
wrench.
The
wrench
should
slide
back
and
forth
with
only
slight
resistance.
Tighten
screw "'A".
NOTE:
Do not change
this elevation
setting
until
both
left
and
right
hand
table
support
channels
have been
adjusted.
SQUARE
HD.
SCREW
s/16-1B x 3/4
TABLE
MOUNTING
SUPPORT
CHANNEL
BASE
/__
FRONT
MOUNT
RAILS
USING
THESE
HOLES
iNDEX
RELEASE
UNLOCK
POSITION
LOCK
i'_
_J
ARBOR
WRENCH
SCREW "A"
5.
Move
arm
and
carriage
to
screw
"B"
and
tighten
support
in the same manner.
6.
Move
arm
and carriage
to
right
hand
support
channel
and level in the same manner
you adjusted
the left hand
support
channel.
7.
Recheck
both
support
channels
to
make
sure
that
tightening
screws
did
not
affect
the
accuracy
of the
adjustment.
8.
Elevate
saw
and place
motor
in vertical
position
to
provide
clearance
for installation
of front
(work)
table.
SCREW
"B"
SCREW
"A"
TABLE MOUNTING
SUPPORT
CHANNEL
(LEFT
HAND)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents