Power Distribution
Ê Install the socket strip with 2 screws onto the PDU brackets.
I
Installation is possible on both sides.
7.3.3.3
Installation options for 600 mm wide symmetrical racks
Rack height
Installation direction vertically
42 HU
Not possible
24 HU
Not possible
16 HU
Not possible
Table 10: Installation options for 600 mm wide symmetrical racks
Performing the task
Ê Install the socket strip onto the socket strip RMK 2U horizontal as described
on
page
71.
Figure 52: 32 A three-phase 15-way socket strip mounted in a 600 mm wide symmetrical rack
Ê Install the PDU kit 3 HU in the required height into the rack.
I
The PDU kit 3 HU may only be mounted from HU 7 upwards.
84
Installation direction horizontally
Max. 2x with PDU kit 3 HU
Max. 2x with PDU kit 3 HU
Max. 2x with PDU kit 3 HU